Site Facilities
CJSC Stroytransgaz has built tank farms in the Novorossiysk sea port and at the Kirishi Refinery, infrastructure for the Verkhnechonskoye deposit and other projects. Our current project portfolio includes the construction of the Kazachya compressor station, a basic facility of the Southern Corridor gas pipeline system where gas will be prepared for shipment to Europe via the South Stream pipeline.
Ongoing Projects
Execution
Schedule |
Project
/ Investor |
Customer | Contract details |
|
|||
|
|||
|
|||
|
|||
|
|||
|
|||
|
|||
|
|||
|
Completed Projects
Execution
Schedule |
Project
/ Investor |
Customer | Contract details |
2013-2015 | Nevinnomissk Compressor Station / Gazprom | Gazprom centrremont |
Full scope of reconstruction activities, including dismantle of the main and auxiliary equipment, as well as 6 turbo pumping unit installation (total capacity: 60 MW) |
2012-2014 | Alexandrovskaya Compressor Station / Gazprom | Gazprom Transgaz Tomsk |
Full scope of reconstruction activities More about the project |
|
|||
2011-2014 | Mikun Compressor Station / Gazprom | Gazprom centrremont |
Full scope of reconstruction activities |
2014-2015 | Facility for electrical equipment repair and maintenance base at Bovanenkovo oil-gas condensate field industrial base/ Gazprom | Gazprom Dobycha Nadym |
Construction of facility for electrical equipment repair as well as a maintenance base. The two facilities are a part of the construction project for the development of the Cenomanian - Aptian deposits of the Bovanenkovo oil, gas and condensate field. The Bovanenkovo field is a priority development target in Yamal.
|
2015-2016 | Mikun Compressor Station / Gazprom | Gazprom centrremont |
Full scope of reconstruction activities on the second stage of station. |
2012-2016 | Kazachya Compressor Station (Southern Corridor gas pipeline project) / Gazprom | Gazprom Invest |
General contract for construction (100 MW), including gas treatment facilities and all related infrastructure More about the project |
2012 | Verkhnechonskoye Field / Verkhnechonskneftegaz | Verkhnechonskneftegaz |
Construction of three well clusters (oil gather networks, oil pipelines and high pressure water conduit) |
2008 | Kirishi Refinery advanced oil processing center / Surgutneftegaz | MSU-90 |
Reservoir assembly |
2008 | Petroleum products terminal / Novorossiysk Sea Port | Yuzhtechmontazh |
Reservoirs assembly |